Description |
Defines the
scope of the project and the vision of the product to be delivered
at the end of the wave. |
| Artifacts |
- Scope document
- Acceptance criteria
- Use Case Model Survey
- Initial glossary
- Initial Project Plan
|
| Milestone |
Lifecycle Objective
(which is reflected by the Inception artifacts) |
|
|
|
|
|
Description |
Defines where
we plan the necessary activities and required resources for the wave.
This is when the detailed requirements are written and the architecture
is designed. |
| Artifacts |
- Use Case Model (80% complete, including survey,
actor identification, and most descriptions and diagrams)
- Supplementary (detailed) requirements
- Architecture description/design/prototype
- Executable architecture prototype
- Development plan for overall project, showing
iterations and evaluation criteria
|
| Milestone |
Life-cycle
Architecture (examine the detailed system objectives, scope, architecture
choices and resolve major risks if any exist) |
|
|
|
|
|
Description |
The product
is built and the vision is evolved, if necessary, during the Construction
phase. This phase is complete when the product is tested and ready
for transfer to the user community. |
| Artifacts |
- Completed detailed design
- Completed Code
- User manuals
- Description of current release
- Completed test scripts
|
|
| Milestone |
Initial Operational
Capability (decide whether the software, sites, and users are ready
to become operational without
exposing the project to high risks) |
|
|
|
|
|
Description |
Packaging,
training and support of the product is done. |
| Artifacts |
- Software installed at wave partner site
- Necessary training completed
- Feedback to be included in the next wav
|
| Milestone |
Product Release |